14
May be useful in planning Z-Bracket
configuration and positioning.
Caulking Gun
Used
to
direct
sealant
into
penetrations to avoid leaking.
Compatible
Sealant
Sealant compatible with your specific
installation.
Spirit Level
Used to ensure panel is level and/or
plumb to the mounting surface and
orientation.
WARNING:
Installation on shingle roofs is not recommended. System is not designed with
these roof types in mind. Fasteners will not penetrate framing deep enough and will likely
cause heavy issues with leaking.
Making Brackets to panel Frame
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...