
5
General Information
A new
RENOGY
Off-Grid Solar Kit will provide you with a clean, silent, and sustainable
way of ensuring that batteries are fully charged and capable of providing a continuous supply of
electricity. Each kit comes equipped with a high quality solar panel that features highly efficient
silicon solar cells. If you have purchased a
RENOGY
Off-Grid Solar Kit, a PWM Solar Charge
Controller is also included in the package. This controller will serve as a connector between the
solar panel and the batteries. The solar charge controller will ensure that the battery is charged
with the appropriate amount of solar power as per the battery manufacturer’s recommendations.
The sola
r charge controller ‘charging states’ are optimized to meet the requirements of most
standard lead acid batteries as well as flooded batteries. The
RENOGY
Off-Grid Solar Kit also
includes a mounting system comprised of sturdy aluminum Z-Brackets as well as the nuts and
bolts required to flat mount a solar panel onto a roof or any other flat surface. If you wish to
optimize your panel’s collection of sunlight by tilting the panel to a different inclination, an
adjustable tilt-mount may be purchased separately.
This manual will provide you with instructions on how to assemble the various
components of a
RENOGY
Off-Grid Solar Kit. Please refer to the separate Renogy Solar
Charge Controller Manual for detailed information about the installation, operation, and
programming of the solar charge controller.
Please read the manual carefully before installing or operating the solar kit to prevent personal
injury or damage to the components. If you have any concerns about the suitability of the kit for
your application, or doubts about any of the instructions in this manual, please contact
RENOGY Support at
1-800-330-8678
.
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...