57
Figure 5.2
Back view of RNG-100D
Figure 5.2
shows the MC4 Connectors that come preassembled with each
RENOGY
solar panel.
When purchasing unassembled MC4 Connectors for custom cabling, it is recommended that the
appropriate crimper is used; this will avoid loose connections and create a strong internal contact
when mating the MC4 Connectors. An example of a great crimping tool is shown in
Figure 5.3.
Figure 5.3
Crimping tool (#14-10 AWG)
Female MC4
+
Male MC4
−
Junction box
Summary of Contents for Off-Grid Kit
Page 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Page 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Page 16: ...16...
Page 17: ...17 Repeat for each Z Bracket in the set at each corner...
Page 18: ...18...
Page 20: ...20...
Page 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Page 27: ...27...
Page 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Page 36: ...36 NOTE Start lag bolt threading by hand...
Page 37: ...37 Rail System Construction 2 1...
Page 38: ...38 4 3...
Page 39: ...39 6 5...
Page 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Page 41: ...41 3 2...
Page 42: ...42 5 4...
Page 44: ...44 3 2...
Page 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Page 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Page 55: ...55 Figure 7 Figure 8...