3
2.10 Commissioning
26
2.10.1 Control Panel
26
2.10.2 Additional guidelines for commissioning
26
2.10.3 Putting the boiler into operation
26
2.10.4 Normal start-up procedure
32
2.10.5 Error during the start-up procedure
32
2.10.6 Read out settings
33
2.10.7 Adjust the boiler according to the system
34
2.10.8 Changing the parameters at service level (with access code)
34
2.10.9 Changing the maximum output (Hi) for CH operation
37
2.10.10 Restore factory settings
38
2.11 Putting the boiler out of operation
38
2.11.1 Boiler with frost protection, during longer periods of non-use
38
2.11.2 Boiler without frost protection, during longer periods of non-use
38
3 INSPECTION AND MAINTENANCE
39
3.1 Inspection
39
3.1.1 Checking the flue pipes and air supply pipes for leaks
39
3.1.2 Checking the condensate siphon
40
3.1.3 Checking the ignition electrode
40
3.1.4 Checking the combustion
41
3.2 Maintenance
42
4 ERRORS
46
4.1 General
46
4.2 Error codes
46
4.3 Control stop or lock-out
49
4.4 Error memory
49
4.4.1 Error read outs
50
4.4.2 Deleting errors
50
5 SERVICE PARTS
51
5.1 General
51
6 EC DECLARATION
54
7 REGULATIONS
55
7.1 EC regulations
55
7.2 Remeha factory test
55
7.3 Additional guidelines
55
8 TECHNICAL SPECIFICATIONS AND WORKING PRINCIPLE
56
8.1 Technical data
56
8.2 The boiler components
57
8.3 Working principle
57
8.3.1 Regulating
57
8.3.2 Advanced boiler control (‘abc
®
’-control)
58
8.3.3 Regulating the water temperature
58
8.3.4 Low flow / water protection
58
8.3.5 High Limit temperature protection
58
9 EFFICIENCY DATA AND GAS EFFICIENCY LABELS
59
9.1 Annual efficiency
59
9.2 Water-side efficiency
59