City Series ACB40E
|
49
installation
Flueing Arrangement for Vertical Terminations
Vertical Flueing with Straight Vertical Flueing and or with a max. of two (2) 90
o
Elbows (1 - 90
o =
2 - 45
o
)
The shaded area in the diagram shows all allowable combinations
of straight vertical and offset to vertical terminations, using two
90
o
elbows, with
Rigid Pipe Flueing Systems
.
Two 45
o
elbows equal to one 90
o
elbow.
• Vent must be supported at offsets.
• Minimum distance between elbows is 305mm.
• Maintain clearances to combustibles as listed in the
"Clearances" section.
• Horizontal vent must be supported every 0.9m.
• Firestops are required at each floor level and whenever
passing through a wall.
• Must use optional rigid pipe adaptor (Part# 510-994) when
using rigid pipe vent systems.
• Refer to the "Vent Restrictor Position" section for details on
how to change the vent restrictor from the factory setting
of Set 0 through to Set 3 if required.
"THIS UNIT MUST ALWAYS
TERMINATE / FLUE
DIRECTLY TO THE OUTDOORS."