City Series ACB40E
|
21
installation
Caution Requirements
The top, back and sides of the fireplace are defined by
standoffs. The metal ends of the standoff may
NOT
be
recessed into combustible construction.
WARNING
Fire hazard is an extreme risk
if these clearances (air space) to combustible materials are not
adhered to. It is of greatest importance that this fireplace and flue
system be installed only in accordance with these instructions.
Clearances
Clearance: 3 sided
Dimension
Measured From:
A: From Floor
Min. 0mm
Bottom of Fireplace Opening
A1 : Mantel Height (min.)
**
Top of Fireplace Opening
B: Sidewall (on one side)
216mm
Side of Fireplace Opening
C: Enclosure Width (min.)
1230mm
Minimum inside dimensions
D: Mantel Depth (max.)
**
E: Alcove Width
2134mm
Side wall to side wall (min.)
F: Alcove Depth
914mm
Front of Unit
G: To Enclosure Ceiling (min/max)
76mm
From top of enclosure
H: Convection Air outlet
306sq cm (min)
* Top/front or side of enclosure
I: Enclosure Depth (min.)
483mm
Minimum inside dimensions
J: Opening Height
383mm
Bottom/Top of Fireplace Opening
K: To Ceiling (min) All 3 sides
38mm
To Top of Ceiling
L: Chase Enclosure (min.)
1600mm
From base of unit/floor
M: Clearance to sprinkler head
(Min.)
914mm
Perpendicular from chase grill
Hearth
0mm
No hearth required
**
See mantel clearances chart in this manual
* A minimum of 774 square centimetres of open area, not lower than 76mm from top of enclosure,
required for all installations — this can be achieved by having an open area in front, each side, and/or
above as shown in the four diagrams on the next page.
E
F
Alcove
Side view
L
Chase grill
Sprinkler
M
Flue Clearances to Combustibles
Horizontal - Top
76mm
Horizontal - Side
51mm
Horizontal - Bottom
51mm
Vertical
51mm
Passing through wall/
floor/ceiling - when
firestop is used.
38mm
The
HeatWave
Duct Kit has differ-
ent clearance and framing require-
ments, check the
HeatWave
manual
for details.