26
|
City Series ACB40E
installation
919-669c
01.19.17
2
CITY SERIES
Part J install to Part B1 + B2
Part J screw locations
Secure Framing to Wall Studs with wood screws
Install Pre Assembled Sidewal
l
Install Pre Assembled Sidewall (opposite)
Part B1 to A - screws go in from front
2. Install Part B1 + B2 to Part A with 2 screws on each side from the front of
the unit.
3. Install Part J (x 2) to Parts B1 + B2 with 4 screws each (2 top - 2 bottom) -
screw locations shown below.
4. Slide unit into position. Check to ensure that the unit is level from front to back
and side to side and Parts A + B are square. Secure the unit with framing
to the wall studs with 76 mm wood screws. Use 8 screws and secure to 4
studs minimum. Install venting before proceeding further with framing
kit construction. Refer to manual for venting instructions.
5. Install one screw (lower screw position) into B1 and B2. Hang the pre as-
sembled RIGHT sidewall off the 2 screws using the keyhole opening on
the sidewall.
6. When sidewall is in position - install the second screw in both B1 and B2
and tighten both screws to secure sidewall.
7. Repeat Steps 5 & 6 on the left side to install opposite pre assembled sidewall.
B1/B2 must be
secured to framing/
studs with a minimum
of 8 screws.
B2
B1