Standard 30 MF
110-700
Operator and Service Manual
4361.DOC010302 AUG18.DOCX
2-14
Edition: 8
CAUTION
Risk of misdirection and resulting accidents
Entering an incorrect type of installation and/or installation direction
will result in miscalculation of the heading angle during operation.
► Verify that the final installation orientation was correctly
defined in the
COMPASS MOUNTING
dialog.
8. Press the
Set
key.
‐
The font color of the selected line changes to orange.
9. Select
EXIT
with the
arrow down
key.
‐
The menu item will be highlighted yellow.
10. Press the
Set
key.
‐
If the previously selected installation orientation has been changed, the
Standard 30 MF will reboot and display the start page on the Operator Unit at the
end of the booting process.
11. Mark the final installation orientation with a cross in the list of chapter 2.5.1 on page
2-43.
12. Operate the Standard 30 MF for at least 90 minutes in final installation orientation.
The ship has to be moored during settling time of 90 minutes.
13. Loosen all cables except one power supply cable.
14. Attach the Standard 30 MF in a position turned 180° ±15° compared to the final
installation orientation during operation (see Figure 2-3).
15. Operate the Standard 30 MF for at least 90 minutes while it is turned 180° compared
to the final installation orientation.
16. Turn the Standard 30 MF to the final installation orientation again while it is in
operation.
17. Connect the Operator Unit, data cables, Ethernet cables (if required) and if applicable
the second power supply cable to the Standard 30 MF.
18. If necessary, acknowledge displayed warnings which were generated due to missing
cable connections.
19. Lay the ground cable to the grounding point on the vessel side.