Commissioning
6
40
Opening the metering slider:
1.
Close the metering slider fully using the control valve.
2.
Set the volume end stop to the maximum value.
3.
Open the metering slider fully using the control valve.
The hydraulic cylinder is at the end stop.
The return spring remains under tension.
Figure 6.9:
Metering slider open, hydraulic cylinder at end stop
Summary of Contents for 2.1
Page 30: ...Machine data 4 24...
Page 32: ...Transport without tractor 5 26...
Page 108: ...Service and maintenance 9 102...