Machine adjustments
79
7
7.8.2
Run calibration test
Requirements:
The metering slider is closed.
PTO and tractor engine are switched off and locked to prevent accidental
starting.
An adequately sized container is ready for collecting the discharged material.
The container's empty weight is known.
Using the fertiliser chart, the pre-set values for the metering slider end stop
are determined and known.
n
WARNING
Risk of injury due to chemicals
Discharged fertiliser may cause injuries to eyes and nasal mucous
membrane.
Wear safety goggles during the calibration test.
Direct all persons out of the danger zone of the spreader
before running the calibration test.
NOTICE
Select the calibration test time to obtain the maximum possible spreading quan-
tity. The greater the amount, the higher the accuracy of the measurement (e.g.
nominal spreading quantity: 10 kg/min, calibration test time: 3 min., calibrated
volume of spreading material: 30 kg).
Summary of Contents for 2.1
Page 30: ...Machine data 4 24...
Page 32: ...Transport without tractor 5 26...
Page 108: ...Service and maintenance 9 102...