2. Install the product in the same manner as mounting a bucket. Install bucket pins.
3. Connect the hoses. An installation inspection must be carried out after the
product has been mounted on the carrier. During installation inspection, certain
specifications (operating pressure, oil flow, etc.) are checked so that they are
within given limits. See “Product specifications” on page 72.
4. Open the ball valves.
5. Remove the air from the hoses by carefully operating the crusher cylinder.
Open and close the empty jaws several times.
Note:
■
If the lines going to the opening and closing connection have two different
pressure values, connect the line with the highest pressure (which should not
exceed the max. value) to the connection fitting jaw closing and the lower
pressure line to the connection fitting jaw opening, in order to have the
maximum clamping force.
■
Remove the cap from the fitting of the hydraulic hoses connecting the excavator
and the crusher.
■
Make sure that the hose fittings are perfectly clean and dust-free, and attach
them to the machine by tightening the screws or the fittings.