
PRONAR T679/5
SECTION 5
5.24
INSPECTION
•
Every 12 months (before winter).
5.4.3 CLEANING AND MAINTAINING PNEUMATIC CONDUIT
CONNECTIONS AND PNEUMATIC SOCKETS
DANGER
Unreliable and dirty trailer connections may cause unreliability and faulty
functioning of brake system.
Connection with damaged body should be replaced. In event of damage to cover or seal,
change these elements for new reliable elements. Contact of pneumatic connection seals
with oils, grease, petrol etc. may cause damage and accelerate ageing process.
If the trailer is unhitched from the tractor, connections should be protected by cover or placed
in their designated socket. Before the winter period it is recommended to preserve the seal
with special preparations (e.g. silicon grease for rubber elements).
Each time before connection of the machine inspect technical condition and cleanness of
contacts and sockets in tractor. If necessary clean or repair tractor socket.
INSPECTION
•
Each time before hitching trailer to tractor.
Summary of Contents for T679/5
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...PRONAR T679 5 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 37: ...SECTION 2 PRONAR T679 5 2 11 FIGURE 2 2 Locations of information and warning decals ...
Page 38: ...PRONAR T679 5 SECTION 2 2 12 ...
Page 39: ...SECTION 3 DESIGN AND OPERATION ...
Page 53: ...SECTION 4 CORRECT USE ...
Page 72: ...PRONAR T679 5 SECTION 4 4 20 ...
Page 73: ...SECTION 5 MAINTENANCE ...
Page 101: ...SECTION 5 PRONAR T679 5 5 29 FIGURE 5 14 Trailer s lubrication points ...
Page 114: ...PRONAR T679 5 SECTION 5 5 42 ...
Page 115: ...NOTES ...
Page 116: ... ...