
PRONAR T679/5
SECTION 4
4.16
Unloading of the trailer is performed in the following sequence:
tractor and trailer must be placed to drive forwards on flat and hard ground,
immobilise tractor with parking brake,
FIGURE 4.2
Unloading load box with hydraulic tailgate
(1) hydraulic tailgate, (2) load box, (3) telescopic cylinder
open hydraulic tailgate (1) (standard) - Figure (4.2), using the cylinder by
operating a lever on the tractor hydraulic manifold,
when unloading the load box equipped with hinged-opening tailgate
(1), the width of the slot opening can be set using chain catches (5),
which should be secured by means of pin (6) and cotter pin (7) –
figure (4.3). If necessary, the slot size can be adjusted by changing
the length of chains (4),
using the manifold lever in the operator cab, tip the load box with a telescopic
cylinder (3),
after unloading, lower the load box and clean the floor edges,
Summary of Contents for T679/5
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...PRONAR T679 5 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 37: ...SECTION 2 PRONAR T679 5 2 11 FIGURE 2 2 Locations of information and warning decals ...
Page 38: ...PRONAR T679 5 SECTION 2 2 12 ...
Page 39: ...SECTION 3 DESIGN AND OPERATION ...
Page 53: ...SECTION 4 CORRECT USE ...
Page 72: ...PRONAR T679 5 SECTION 4 4 20 ...
Page 73: ...SECTION 5 MAINTENANCE ...
Page 101: ...SECTION 5 PRONAR T679 5 5 29 FIGURE 5 14 Trailer s lubrication points ...
Page 114: ...PRONAR T679 5 SECTION 5 5 42 ...
Page 115: ...NOTES ...
Page 116: ... ...