
4.
Mount the server to the rack.
Make sure the side knots on both sides of the server are properly placed in the rack rail holders.
See picture below.
d
ata
and
management
cOnnectiOnS
Now setup a keyboard and monitor, and connect the cables from the server to the Vess R2000 storage system.
See the illustrations below to see the location and appearance of the ports and power inserts on the back of the
VSky A1100.
PS/2 keyboard
VGA monitor
USB keyboard
Power and keyboard connections on rear panel
Power cable receptacles
Power Supply Status LEDs
10
VSky A1100 Product Manual
Promise Technology, Inc.