Club Belt Replacement
Bi-Annually
PR34 A01
Printed in USA 12/20 © 2020
63
527-504revM_EN
Prince Castle DCFT
-MCD V
ertical T
oaster
Bi-Annually PR34
A01
Why
To maintain effectiveness of the Prince Castle MCD DCFT conveyor belt
Time required
5 minutes to prepare
5 minutes to complete
Time of day
After close
For 24-hour restaurants: during low-volume times
Hazard icons
Chemicals
Electricity
Hot Surfaces
Equipment Alert
Tools and supplies
Heat Resistant
Gloves
Procedure
Turn the toaster OFF and
Unplug Toaster.
After waiting 15 minutes for unit
to cool, put on the heat resistant
gloves.
Hot Surfaces
NOTE: Failure to wear
heat-resistant gloves while
performing this cleaning
procedure can result in burns.
Loosen thumbscrew
on left-hand side
cover and pull cover
down to remove.
Pivot latch arm and secure in metal clip.
Remove belt tension by pivoting tension arms up.
Remove old belts.
Install new belts.