3.20
ENGINE
29. Mark the upper jam nut and loosen the lower jam nut. Pull
the shift cable out of the mount.
NOTE: If the upper jam nut is moved, shift cable
adjustment will be required during engine
installation (see Chapter 2 “Shift Cable Inspection /
Adjustment”).
30. Disconnect the transmission gear indicator switch harness.
31. Disconnect the CPS harness.
32. Disconnect the stator / alternator harness.
33. Disconnect the transmission speed sensor harness.
34. Remove the castle nuts from both rear wheel hubs.
Lower
Jam Nut
Mark Upper
Jam Nut
Gear Switch
Connector
CPS
Connector
Stator
Connector
Speed Sensor
Connector
Castle Nut
Summary of Contents for 2008 Ranger RZR
Page 9: ...1 9 GENERAL INFORMATION 1 SAE Tap Drill Sizes Metric Tap Drill Sizes Decimal Equivalents ...
Page 16: ...2 6 MAINTENANCE COMPONENT INSPECTION SERVICE LOCATIONS Front and Rear View ...
Page 17: ...2 7 MAINTENANCE 2 RH and LH Side Views ...
Page 42: ...3 2 ENGINE ENGINE SPECIFICATIONS Crankcase Exploded Views ...
Page 43: ...3 3 ENGINE 3 Oil Pump Water Pump Engine Cover Exploded View ...
Page 44: ...3 4 ENGINE Stator Cover Starter Water Pump Oil Filter Pressure Relief Exploded View ...
Page 45: ...3 5 ENGINE 3 Cylinder Cylinder Head Piston Exploded View ...
Page 104: ...NOTES ENGINE 3 64 ...
Page 139: ...4 35 ELECTRONIC FUEL INJECTION 4 Fuel Injector PTO Circuit Fuel Injector MAG Circuit ...
Page 142: ...4 38 ELECTRONIC FUEL INJECTION Throttle Position Sensor TPS Circuit Fuel Pump Circuit ...
Page 230: ...NOTES FINAL DRIVE 7 36 ...
Page 287: ...10 17 ELECTRICAL 10 COOLING SYSTEM SCHEMATIC Cooling System Break Out Diagram ...
Page 308: ...10 38 ELECTRICAL Instrument Cluster Circuit Transmission Switch Circuit ...
Page 309: ...10 39 ELECTRICAL 10 Wheel Speed Sensor Circuit AWD Circuit ...
Page 310: ...10 40 ELECTRICAL Fuel Gauge Display Circuit Cooling Fan Circuit ...
Page 311: ...10 41 ELECTRICAL 10 Charging System Circuit ...
Page 312: ...NOTES ELECTRICAL 10 42 ...