85
ASX 176
Use, maintenance and warning instructions
HIGH PRESSURE REGULATOR
|
COMMISSIONING
|
REV. 00
EN
8.3 - PROPER COMMISSIONING CHECK
Completely sprinkle the equipment with a foaming solution (or equivalent control system) in order to check the tightness
of the external surfaces of the regulator and the connections made during the installation.
8.4 - CALIBRATION OF ANY ACCESSORIES
To properly calibrate all the accessories in the equipment, refer to table 8.50 where, starting from the calibration of the
regulator, all relevant values are defined:
Calibration of a line consisting of: ASX 176 + built-in monitor PM/176
or SSX/176 slam-shut valve
Calibration
REGULATOR
(Pd) bar
Calibration
MONITOR
Calibration
ACCELERATOR
Calibration
Max pressure
SLAM-SHUT
DEVICE
Calibration
Min pressure
SLAM-SHUT
DEVICE
0.8 - 2.1
Pd x 1.1
Pd x 1.2
Pd x 1.5
Pd - 0.3 bar
2.1 - 5
Pd x 1.1
Pd x 1.2
Pd x 1.4
Pd - 0.5 bar
5 - 25
Pd x 1.05
Pd x 1.1
Pd x 1.3
Pd - 3 bar
25 - 60
Pd x 1.03
Pd x 1.06
Pd x 1.3
Pd - 5 bar
Tab. 8.51.
Summary of Contents for ASX 176
Page 32: ...32 ASX 176 EN Use maintenance and warning instructions HIGH PRESSURE REGULATOR SAFETY REV 00 ...
Page 253: ...253 ASX 176 ...
Page 254: ......