2
B
asic Orien
tation
Basic Orientation
LIFEPAK 20e Defibrillator/Monitor Operating Instructions
2-3
©2006-2015 Physio-Control, Inc.
UNPACKING AND INSPECTING
After you have removed the LIFEPAK 20e defibrillator/monitor from the shipping container, make
sure you have all the required supplies and accessories including cables and ECG paper.
Examine the defibrillator and all accessories for any sign of damage that may have occurred
during shipping. If possible, save the shipping container and foam inserts in case you have to
ship the defibrillator at a later date.
Note the label located to the right of the screen (
). Before the defibrillator/monitor’s first
use, plug the power cord into an AC outlet for 3 hours to charge the internal battery.
Figure 2-1
Initial Battery Charge
If you purchased the CodeManagement Module, you will need to connect it to the LIFEPAK 20e
defibrillator/monitor. Refer to the
Installation Instructions
provided with the CodeManagement
Module for more information.
Summary of Contents for LIFEPAK 20
Page 2: ...LIFEPAK 20e DEFIBRILLATOR MONITOR Operating Instructions ...
Page 3: ......
Page 4: ...LIFEPAK 20e DEFIBRILLATOR MONITOR OPERATING INSTRUCTIONS ...
Page 15: ......
Page 49: ......
Page 111: ......
Page 155: ......
Page 171: ......
Page 181: ......
Page 183: ......
Page 189: ......
Page 191: ......
Page 195: ......
Page 199: ......
Page 201: ......
Page 205: ......
Page 209: ......
Page 211: ......
Page 213: ......
Page 215: ......
Page 221: ......
Page 226: ......