Title
LIFEPAK 15 Monitor Defibrillator CO2 Upgrade
Page
6 of 33
Doc Type
Service Process Document
Doc ID
3308217
Doc Rev
A
Doc State
Released
State Date
09/08/2011
4.
Disassembling the Case (continued)
4.6
Lay the defibrillator face down on a protective
surface to prevent damage, and then remove
the 14 case screws (201407-069). Discard the
screws.
4.7
Holding the case halves together, position the
device face-up on your work surface. Lift the
front case assembly slightly above the rear to
access the connecting cables.
DANGER
SHOCK HAZARD
Lethal voltages may be present even
without operator action. Always discharge the energy
storage capacitor prior to servicing. See the service
manual
“
Capacitor Discharging Procedure”
for detailed instructions
Remove Screws
(7 places)
Remove Screws
(2 places)
Remove Screws
(5 places)