Philadelphia Scientific
®
iBOS
®
Pro 6 Series Installation Manual
Page 82 of 84
Appendix E – Custom Sentinel™ Data Cable
Step1: Cat 3 bulk Sentinel
™ Data Cable is measured out to the desired length and then cut and
Step 2: Terminate the cable with the following as in the RJ12 EZ Diagram.
Pin 1
– Orange
Pin 2
– Orange/White
Pin 3
– Blue
Pin 4
– Blue/White
Pin 5
– Green
Pin 6
– Green/White
RJ12 EZ Sentinel
™ Data Cable Termination 1
Step 4: Check to ensure there are no crossed wires and all are seated evenly in the jack, then crimp firmly.
The tool will remove the excess wires at the end.
Step 5: Test the continuity of the wire with the cable tester in the kit. Do the quality
test twice.