4.3 Charger Configuration
To maximize system performance and avoid operator confusion, check the charger settings to ensure they
are not programmed to
-
Delay Start
-
Delay Equalize Charge
-
Cool Down delay
iBOS
®
will manage which battery to take next and maximize the cool down for the pool so delay settings
are no longer needed and may create delays and confusion if left in place.
4.4 Pre-installation Phone Conference
Part of the service that Philadelphia Scientific
®
provides with each iBOS
®
is a pre-installation phone call.
One of our experienced iBOS
®
technicians will verify receipt of the materials for your installation and review
the Control Box set-up procedures. Finally he or she will answer any questions about the iBOS
®
product
and installation. This usually takes 30 minutes for a complex installation.
4.5 Useful Tools and Materials
There are some tools that are essential to have when installing an iBOS
®
.
Tools and Supplies for Installation:
Drill
(for mounting the Control Box)
Cordless Drill (hammer-drill combo)
Hammer Drill bits
Anchors
(for mounting the Control Box)
Level
(for mounting the Control Box)
10 mm Nut Driver
(
Klein 630-10MM) (used to secure Scrolling Display to mounting brackets)
Phillips Screw Driver
(opening Control Box)
Diagonal-Cutting Pliers
(for snipping off the cable ties on the Sentinels
™) Klein
D228-8
Multi-meter
Ladders
Flashlight (head mount lamps are helpful for 2 hand Sentinel
™
mounting).
Extension cords
Other Items:
Vinyl stick-on numbers
(for marking battery locations. 1” (25.4 mm) white
number sets. 100 characters 10 each of 0-9. McMaster-Carr
®
part number
5752T545.)
Single-Channel or Uni-Strut
®
Slotted-Hole Channel,
(for Sentinel
™ Data
Cable bridging from Control Box
to 1 5/8” x 1 5/8”, Zinc-Plated Steel Sold by the foot
McMaster-Carr
®
part number 3310T201
)