52 . High-Performance Lambda Spectrometers Hardware Guide
Overview of Accessory Installation
NOTE: The spheres, Three Detector Module and the URA Accessory are covered in separate
manuals. See the
High-Performance Lambda Spectrometers User Manuals CD
(L6050009).
Automatic Cell Changers
Connector on Spectrometer:
15-pin connector
Installation:
See the cell-changer manual
Cables:
Lead through bottom of spectrometer housing
Tubes:
Lead through bottom of spectrometer housing
Sample compartment cover:
Unchanged
Alignment:
See cell changer manual
Temperature Sensor
Connector on spectrometer:
Slot in accessory board
Installation:
See temperature sensor description
Cables:
Lead through the tube ports
Sample compartment cover:
Unchanged
NOTE: When connecting the temperature sensor, align the red mark on the plug with the
red mark on the socket. Pull back the collar on the plug to connect/disconnect the
plug. Release the collar to secure the plug.
Sippers
Connector on spectrometer:
15-pin connector
Installation:
See sipper manual
Cables:
See sipper manual
Tubes:
See sipper manual
Sample compartment cover:
Install the special sample compartment front
plate and cover
Summary of Contents for Lambda 1050
Page 1: ...HIGH PERFORMANCE LAMBDA SPECTROMETERS Hardware Guide UV VIS SPECTROSCOPY ...
Page 5: ...Introduction ...
Page 11: ...Safety Practices ...
Page 25: ...System Description ...
Page 32: ...32 High Performance Lambda Spectrometers Hardware Guide ...
Page 33: ...Installing your Lambda Spectrometer ...
Page 54: ...54 High Performance Lambda Spectrometers Hardware Guide ...
Page 55: ...Using the Spectrometer ...
Page 64: ...64 High Performance Lambda Spectrometers Hardware Guide ...
Page 65: ...Maintenance ...
Page 76: ...76 High Performance Lambda Spectrometers Hardware Guide ...
Page 77: ...Appendices ...
Page 82: ...82 High Performance Lambda Spectrometers Hardware Guide ...