Installing your Lambda Spectrometer . 35
Unpacking
CAUTION
Take great care when installing your Lambda spectrometer, and follow
the procedures described in this manual. If you require assistance,
contact your PerkinElmer Service Engineer.
WARNING
The instrument weighs about 77 kg. Four people are needed to lift the
instrument.
1.
Unpack the components carefully, using four people to lift the instrument itself.
Keep the packing materials for possible future storage or reshipment.
Figure 13 Position of hands beneath the instrument for lifting the instrument
Summary of Contents for Lambda 1050
Page 1: ...HIGH PERFORMANCE LAMBDA SPECTROMETERS Hardware Guide UV VIS SPECTROSCOPY ...
Page 5: ...Introduction ...
Page 11: ...Safety Practices ...
Page 25: ...System Description ...
Page 32: ...32 High Performance Lambda Spectrometers Hardware Guide ...
Page 33: ...Installing your Lambda Spectrometer ...
Page 54: ...54 High Performance Lambda Spectrometers Hardware Guide ...
Page 55: ...Using the Spectrometer ...
Page 64: ...64 High Performance Lambda Spectrometers Hardware Guide ...
Page 65: ...Maintenance ...
Page 76: ...76 High Performance Lambda Spectrometers Hardware Guide ...
Page 77: ...Appendices ...
Page 82: ...82 High Performance Lambda Spectrometers Hardware Guide ...