38 .
Spectrum RX I Getting Started Guide
Alignment-light
control-lever in
this position
J-stop must
be removed
Figure 16 The Sample Slide
3.
To confirm that the beam path is clear of all obstructions, press
PROCEED
The Spectrum RX I starts a series of tests. When it finishes, a
confirmation screen appears.
4.
At the confirmation screen, press
PROCEED
The following screen appears: