
35
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D4 Climbing procedure
Operating the hydraulic unit
■
Observe the manufacturer’s assem-
bly instructions.
■
Connect the power connections,
data connections and remote con-
trols.
Connecting to power supply
1. Check that all hoses and cables are
connected and securely arranged
(e.g. pump/group, remote control).
2. Check that all climbing groups are
collated correctly.
3. Connect the Power Ca-
ble RCS MAX CEE 32A 2m (
4
) or
Power Cable RCS MAX 2m (
22
) to
POWER IN (
3.5
).
4. Connect the Power Ca-
ble RCS MAX CEE 32A 2m (
4
) or
Power Cable RCS MAX 2m (
22
) to
the power supply.
– Ensure that the supply cable is
long enough.
– If necessary, attach strain relief.
– Take climbing differences between
uncoupled platforms of up to
0.6 m into account!
5. Check the rotary field on the keypad
(
3.23
): If all the keys on the keypad
are flashing red/white, the rotary
field is not set correctly. If necessary,
change rotary field using manual
phase inverter on the Power Ca-
ble RCS MAX CEE-32A 2 m (
4
), see
Section D7 “Remedial Action for Mal-
functions”.
6. Carry out any additional steps in the
manufacturer’s assembly instruc-
tions.
→
The pumps are prepared.
Fig. D4.01
Fig. D4.02
3.5
3.23
Summary of Contents for 135413
Page 58: ...58 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...
Page 59: ...59 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...
Page 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...