1
5
. CHECKING COMPONENTS
See ----- Tube defrost.
Feel ----- The difference between tube’s temperature.
Test ----- Test pressure.
1
5
. Checking components
1
5
.1 Check refrigerant system
TEST SYSTEM FLOW
Conditions:
①
Compressor is running.
②
The air condition should be installed in good ventilation.
Tool: Pressure Gauge
Technique:
①
see
②
feel
③
test
cooling run
heating run
Lo
Hi
Pressure
gauge
Lo
Hi
Pressure
gauge
Lo
Hi
Pressure
gauge
Lo
Hi
Pressure
gauge
Lo
Hi
Pressure
gauge
Lo
Hi
Pressure
gauge
63
Summary of Contents for 3PAMSHHQC18-MZO2
Page 12: ...3 OUTLINES AND DIMENSIONS 3 Outlines and dimensions 18K Unit in mm 8...
Page 15: ...42K Unit in mm 3 OUTLINES AND DIMENSIONS 11...
Page 26: ...7 REFRIGERANT CYCLE 7 Refrigerant cycle 18K 24K 22...
Page 29: ...8 WIRING DIAGRAM 24K Electric wiring diagram 1993419 F 25...
Page 30: ...8 WIRING DIAGRAM 36K Electric wiring diagram 2000947 H 26...
Page 31: ...8 WIRING DIAGRAM 42K Electric wiring diagram 2087381 B 27...