![Pentair Raychem HWAT System Installation And Operation Manual Download Page 62](http://html1.mh-extra.com/html/pentair/raychem-hwat-system/raychem-hwat-system_installation-and-operation-manual_1525813062.webp)
1
General Information
8
EN-RaychemHWATECOcontroller-IM-H57340 03/13
Ground-fault protection
WARNING: To minimize the danger of fire from
sustained electrical arcing if the heating cable is
damaged or improperly installed, and to comply with
the requirements of approvals agencies, Pentair
Thermal Management and national electrical codes,
ground-fault equipment protection must be used on
each heating cable branch circuit. Arcing may not be
stopped by conventional circuit protection. The
HWAT-ECO does not include ground-fault protection.
Pre-Installation testing
Prior to installing the HWAT-ECO controller, perform
the insulation resistance (Megger) test and circuit
length verification (Capacitance) test on the heating
cable as detailed in the HWAT System Installation
and Operation Manual (H57548).