P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
PES1900NR Operations Manual
Chapter 5. Installing the Growth Cabinet — 83
Figure 59 AC Power Connections for Growth Cabinet
Figure 60 AC Power Connections for Primary Cabinet – Type 1