
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
— Chapter 5. Installing the Growth Cabinet
PES1900NR Operations Manual
74
Figure 47 Mounting Bell Housing unit to Primary Cabinet
9. Connect and latch the ribbon cable to the alarm socket, aligning the arrows on the cable and
the socket, as shown.