Introduction to DBS 576 Programming
Section 400-Programming
Intro-12
●
DBS 576 (USA) issued 05/20/98
576-13-400
FF1
System
FF2
Trunks
FF3
Extensions
FF4
FF-/Soft Keys
FF5
Groups
FF6
TRS/ARS
0
System
Configuration
FF7
Applications
FF8
Maintenance
Introduction
Appendix A
Appendix B
FF1
System
FF2
Trunks
FF3
Extensions
FF4
FF-/Soft Keys
FF5
Groups
FF6
TRS/ARS
0
System
Configuration
FF7
Applications
FF8
Maintenance
Introduction
Appendix A
Appendix B
Software Upgrade Procedure for CPC-576
1. Power-off the system.
2. Remove the old PC Card from the CPC-576,
and insert the new PC Card.
3. On the CPC card, press and hold down the
MODE button, then power-on the system.
Keep holding the MODE button down until
the “MN” LED starts flashing red.
4. Wait until the RUN (top two) LEDs blink
continuously and the bottom two (MJ and
MN) LEDs remain extinguished.
❒
On installed display phones, “Welcome to
DBS” should display on the top line.
5. On the CPC card, press the RESET button.
❒
After a few seconds, the system will shut
off, then power-on automatically.
❒
“INITIALIZING” will briefly appear on
one of the installed display phones while
the system resets itself.
❒
The CPC LEDs should return to normal
(top two LEDs blinking continuously;
bottom two LEDs off).
❒
All installed display phones should show
the normal, main menu:
RUN LED (FPU)
RUN LED (MPU)
MJ LED
MN LED
RESET button
CODE rotary switch
MODE button
RAM HOLD switch
MOH plug-in
(front edge, facing out from cabinet)
The CPC-576 Card
00:07 Wed JAN 01
100
EXT100