44
:LULQJH[DPSOHRIYROWDJHGHWHFWLRQFDEOH
This section shows the wiring examples of the voltage detection cables at the base metal side to the base metal.
:LULQJH[DPSOHVIRUSOXUDOZHOGLQJVWDJHV
Connect the base metal side voltage detection cable cable to the stage farthest from the base metal side power cable which
connects to the base metal terminal of the welding power supply, away from the base metal side cable.
:LULQJH[DPSOHZKHQSRZHULVVXSSOLHGZLWKDSRZHUIHHGLQJEUXVKWRWKHSRVLWLRQHU
Insulate the power feeding brush from the jig base and connect the voltage detection cable (base metal side) to the jig base.
T I P S
Before wiring the voltage detection cable, check that conduction between the jig base and
the base metal is stable.
NOTE
If the voltage detection cable is tightened together with the cable terminal on the base metal
side connected to the power supply brush, welding will become unstable.
Power cable for base
metal side
Voltage detection cable
for base metal side
Stage 1
Stage 2
Stage 3
Keep distance
The wire feeder or the welding
power source is connected
Connect to base
metal terminal side of
welding power supply
Insulation
Base metal
Jig base
Insulation
Feeding brush
Positioner
Voltage detection cable
for base metal side
Power cable for base metal side
Power cable for base
metal side
The wire feeder or the welding
power source is connected
Summary of Contents for Welbee M350 II
Page 1: ...Welbee M350 II M500 II OWNER S MANUAL July 2021 Manual No P30355 1 DAIHEN Corporation...
Page 140: ...REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 138...
Page 141: ...139 Chapter 10 Reference Materials REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 WB M502...
Page 142: ...REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 140...