IG-310-EN version 01; 31/03/2021
80
Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
b.
Insert the feeder disconnector operating lever
(BLACK knobs) in the bottom feeder disconnector
actuating shaft (area marked with WHITE line).
Figure 7.116.
Lever inserted in the bottom feeder disconnector actuating
shaft
c.
Turn the lever ANTICLOCKWISE until final actuator
position is reached.
Figure 7.117.
Bottom feeder disconnector open, after turning
the lever
Summary of Contents for cpg.0 lite
Page 91: ......