Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
c.
Turn the lever CLOCKWISE until final actuator
position is reached.
Figure 7.85.
Bottom earthing switch closed, after turning the lever
d.
Remove the operating lever. The selector switch
automatically returns to its central position.
Feeder disconnector operation selection is blocked
with the earthing switch closed.
Figure 7.86.
Final position after completing the operation