IG-310-EN version 01; 31/03/2021
34
Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
7.1.3. Dielectric test for the cables
Starting position:
feeder disconnector OPEN and
earthing switch OPEN.
1.
Close the earthing switch.
a.
Move the selector switch to the right, to earthing
switch position.
Figure 7.18.
Selector switch in earthing switch position
b.
Insert the earthing switch operating lever (YELLOW
knobs) in the earthing switch actuating shaft (area
marked with YELLOW line).
Figure 7.19.
Lever inserted in the earthing switch actuating shaft
Summary of Contents for cpg.0 lite
Page 91: ......