IG-310-EN version 01; 31/03/2021
67
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
Operations sequence
3.
Close the circuit-breaker.
a.
The spring charging status indicator shows
UNCHARGED. Move the access locking cover to the
right and insert the spring charging lever.
Figure 7.91.
Spring charging lever inserted
b.
Turn the lever ANTICLOCKWISE about one and a
half turns until the spring charging status indicator
shows springs CHARGED. Remove the lever.
Figure 7.92.
Springs charged
Summary of Contents for cpg.0 lite
Page 91: ......