IG-310-EN version 01; 31/03/2021
56
Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
c.
Turn the lever CLOCKWISE until final actuator
position is reached.
Figure 7.69.
Bottom feeder disconnector closed, after turning the lever
d.
Remove the operating lever. The selector switch
automatically returns to its central position.
Earthing switch operation selection is blocked with
the feeder disconnector closed.
Figure 7.70.
Final position after completing the operation