IG-310-EN version 01; 31/03/2021
66
Operations sequence
General instructions
cpg
.0 lite: GIS medium-voltage switchgear,
gas insulated, up to 24 kV,
in accordance with IEC Standard
c.
Turn the lever CLOCKWISE until final actuator
position is reached.
Figure 7.89.
Top feeder disconnector closed, after turning the lever
d.
Remove the operating lever. The selector switch
automatically returns to its central position.
Earthing switch operation selection is blocked with
the feeder disconnector closed.
Figure 7.90.
Final position after completing the operation
Summary of Contents for cpg.0 lite
Page 91: ......