Return the Server to the Normal Operating Position
Return the Server to the Normal Operating Position
Caution -
The chassis is heavy. To avoid personal injury, use two people to lift the server and
set it in the rack.
1.
Release the slide rails from the fully extended position by pushing the release
tabs on the side of each rail.
2.
While pushing on the release tabs, slowly push the server into the rack.
Ensure that the cables do not get in the way.
3.
Reconnect the cables to the rear of the server.
If the CMA is in the way, disconnect the left CMA release and swing the CMA open. See
.
4.
Reconnect the CMA.
Swing the CMA closed and latch it to the left rack rail. See
Server Installation
for more detail
about attaching the CMA.
Returning the Server to Operation
173
Summary of Contents for SPARC T8-2
Page 1: ...SPARC T8 2 Server Service Manual Part No E80511 04 June 2019 ...
Page 2: ......
Page 10: ...10 SPARC T8 2 Server Service Manual June 2019 ...
Page 12: ...12 SPARC T8 2 Server Service Manual June 2019 ...
Page 24: ...Server Block Diagram 24 SPARC T8 2 Server Service Manual June 2019 ...
Page 26: ...26 SPARC T8 2 Server Service Manual June 2019 ...
Page 62: ...62 SPARC T8 2 Server Service Manual June 2019 ...
Page 82: ...82 SPARC T8 2 Server Service Manual June 2019 ...
Page 110: ...110 SPARC T8 2 Server Service Manual June 2019 ...
Page 114: ...114 SPARC T8 2 Server Service Manual June 2019 ...
Page 128: ...128 SPARC T8 2 Server Service Manual June 2019 ...
Page 136: ...136 SPARC T8 2 Server Service Manual June 2019 ...
Page 146: ...146 SPARC T8 2 Server Service Manual June 2019 ...
Page 164: ...164 SPARC T8 2 Server Service Manual June 2019 ...
Page 170: ...170 SPARC T8 2 Server Service Manual June 2019 ...
Page 176: ...176 SPARC T8 2 Server Service Manual June 2019 ...
Page 182: ...182 SPARC T8 2 Server Service Manual June 2019 ...
Page 188: ...188 SPARC T8 2 Server Service Manual June 2019 ...