OPW Fuel Management System’s fuel control systems are listed for use in a non-classified area. All of the
equipment must be installed outside of the hazardous areas.
NOTE:
Local codes can dictate specific installation requirements. Installation is subject to
approval by the local authority that has jurisdiction at the site.
1.4.2 Installation Requirement
OPW Terminals are designed to be installed above the hazardous area when using the terminal’s associated
pedestal.
The pedestal can be mounted in the hazardous area but a seal-off must be the first fitting for all conduits that
go into the area.
IMPORTANT:
All unused knockout holes that have been removed must be sealed.
For more information on conduit and seal-off installation for PV200 see
.
Figure 1-1 Dispenser Installations
Doc. No.: M1010 Rev.: 10
Page 11 of 98
Summary of Contents for Petro Vend 200 M1010
Page 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Page 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Page 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Page 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Page 98: ......