5.1 Power Conduit Installation
22
5.2 PCM Conduit Installation
23
5.2.1 Pump Control/Pulser Conduit
23
5.2.2 Pump Pulser Conduit
23
5.3 System Power Wiring
23
5.4 PCM Pump Dispenser Wiring
24
5.4.1 Pump/Dispenser Wiring
24
5.4.2 Pump/Dispenser Pulser Wiring
26
5.5 PCM Startup/Configuration
26
5.5.1 Configuration (DIP Switches)
26
5.5.2 PCM Testing
28
Section 6 Complete the Installation
30
Section 7 System Configuration
31
7.1 Terminal Setup/Test Menu
31
7.1.1 Display Menu
32
7.1.2 Keypad Menu
32
7.1.3 Reader Menu
33
7.1.4 Tones Menu
33
7.1.5 System Network Number Menu
34
7.1.6 Petro-Net™ Setup Menu
34
7.1.7 Miscellaneous Menu
34
7.1.8 Pump Control Menu
35
7.1.9 Software Updates
36
7.2 Management Menu
36
7.2.1 Site Management
37
Doc. No.: M1900 Rev.: 8
Page 4 of 65