Section 6 Complete the Installation
NOTICE:
Double-check the wiring before applying power to the system components. Applying
line (L) voltage to low-voltage inputs will damage the system.
Remove the yellow paper safety strip from the SIMM battery. If the system ever requires a cold-start, place a
piece of paper or business card into the battery clip. A cold-start will clear all configuration settings except for
transactions.
Now that the wiring has been installed and the system has been tested, the installation can be completed as
follows:
1. Put the Lexan shield back in place and secure it with the two (2) hex nuts.
2. Reconnect the USB cable.
3. Slide the heater assembly back in place and secure it with the two (2) hex nuts.
4. Reconnect the heater cable.
Pedestal Door Installation
5. Install the pedestal door.
a. Place the two (2) holes in the bottom of the door over the door pins in the front of the pedestal
base.
b. Swing the top of the door into place as shown in the illustration.
c. Secure the door using the two (2) supplied hex bolts.
Doc. No.: M1900 Rev.: 8
Page 30 of 65