Operation manual
G9SR
Page 73 of 79
11.3.3
Solution -
block diagram
The solution is using 2 G9SR-BC, 1 G9SR-AD and 1 G9SR-EX
G9SR-BC1
Input:
Monitoring of
E-Stop pushbutton
Output:
Input loop function
G9SR-BC2
G9SR-AD
G9SR-EX
Input:
Monitoring of
Door Switch
Output:
Input loop function
Input:
Monitoring of
Safety Light Curtain
Output:
Winder Motor
Contactors
Input:
Output loop func-
tion
Output:
Solenoid Door
locking switch
14.3.4 Function settings and DIP switch settings
G9SR-BC1:
Dynamic input test Enabled
EDM Disabled
Input loop Enabled
G9SR-BC2:
Dynamic Input test Enabled
EDM Disabled
Input loop Enabled
G9SR-AD
Dynamic Input test Disabled
Manual Restart
EDM Enabled
Input loop Enabled
Output loop Enabled
G9SR-EX:
EDM Enabled
Output loop Enabled
OFF-Delay time = 30s
Summary of Contents for G9SR
Page 1: ...ZX T Series Cat No J12E EN 03 G9SR Safety Relays OPERATION MANUAL G9SR BC G9SR AD G9SR EX...
Page 34: ...Operation manual G9SR Page 8 of 79 3 1 Test the OFF behaviour...
Page 35: ...Operation manual G9SR Page 9 of 79 3 2 Test the ON behaviour...
Page 102: ...Operation manual G9SR Page 76 of 79 My notes...
Page 105: ...Operation manual G9SR Page 79 of 79 My notes...