Operation manual
G9SR
Page 4 of 79
2
Installation and configuration
To install G9SR units:
2.1
Step 1: Installation environment
Disconnect all electrical power sources before installing and connecting a G9SR unit.
Ensure the environment is with the specifications as mentioned in Chapter 4
on page 10.
See also:
•
on page 18
2.2
Step 2: Mechanical installation
The installation should be carried out by qualified personnel only.
Mount each G9SR unit on a DIN-rail in a vertical position as shown in the figure below.
All other mounting directions might cause heating problems.
To apply rated current outputs of G9SR and for enough ventilation and wiring space,
allow following free space around the G9SR unit:
A) At least 25 mm at the left and at the right side of each G9SR.
B) At least 50 mm above each G9SR and below each G9SR.
The fixing clip of the housing must be in the locked position.
Summary of Contents for G9SR
Page 1: ...ZX T Series Cat No J12E EN 03 G9SR Safety Relays OPERATION MANUAL G9SR BC G9SR AD G9SR EX...
Page 34: ...Operation manual G9SR Page 8 of 79 3 1 Test the OFF behaviour...
Page 35: ...Operation manual G9SR Page 9 of 79 3 2 Test the ON behaviour...
Page 102: ...Operation manual G9SR Page 76 of 79 My notes...
Page 105: ...Operation manual G9SR Page 79 of 79 My notes...