
CHAPTER 17 – Best Practices
OMRON
Page 258
Release 2.0
•
Use ‘Standard’ update rates.
CX-Supervisor only allows update rates in standard groups, which allows a greater chance for CX-
Server to optimise reads together. Old projects may still be using non-standard update rate and are
best changed to the standard rates.
•
Use few update rates.
Even when using the standard update rates, use as few different update rates as possible, ideally 5 or
less different rates. Try to use the same update rates for the same areas of PLC memory so
optimisations can occur.
•
Use sensible update rates.
Aim to keep update rates low. 5 seconds or 1 second updates should suffice. If faster than 1 second
updates are needed always question “Why?”. If fast update rates are required pay special attention to
consider if they can be disabled when not required.
•
Use Copy/Paste to Excel for bulk editing
During development, the point editor supports Copying and Pasting in textual format so Excel’s
powerful editing / formulas can be used to create definitions for points. This can allow thousands of
consecutive points to be created in seconds.
•
Use <Shift> and <Ctrl> to select multiple points for editing
During development, using <Shift> and <Ctrl> while selecting can be useful to apply the same
changes to many points.
•
Use Hungarian notation
Improve readability and maintenance by defining and using a standard naming convention. For
example Hungarian notation where variable names are prefixed by a type character e.g.
bMyBooleanPoint, nMyIntegerNumber, txtMyTextPoint or rMyReal.
•
Use default optimisations
Leave the default communications optimisations turned on. In nearly all cases they really do provide
the best solution. Seek advice if you are considering turning them off.
•
Delete unused points
After a development phase and prior to deployment, delete any unused points. These are listed in the
Point Editor under the group “<Unused Points>”.
Drawing
This section covers some good practices when drawing the screens. These can greatly speed up
application development and help produce a professional looking system.
Summary of Contents for CX-SUPERVISOR - V2.0
Page 2: ...CX Supervisor User Manual Software Release 2 0...
Page 3: ......
Page 5: ...CX Supervisor User Manual OMRON Page ii Revision 2 0...
Page 7: ...CX Supervisor User Manual OMRON Page iv Revision 2 0...
Page 11: ...CX Supervisor User Manual OMRON Page viii Revision 2 0...
Page 13: ...CX Supervisor User Manual OMRON Page x Revision 2 0...
Page 15: ...CX Supervisor User Manual OMRON Page xii Revision 2 0...
Page 17: ...CX Supervisor User Manual OMRON Page xiv Revision 2 0...
Page 19: ...CX Supervisor User Manual OMRON Page xvi Revision 2 0...
Page 21: ...CX Supervisor User Manual OMRON Page xviii Revision 2 0...
Page 23: ......
Page 67: ......
Page 97: ......
Page 137: ...CHAPTER 7 Graphics Library OMRON Page 114 Release 2 0...
Page 183: ...CHAPTER 9 Animation OMRON Page 160 Release 2 0...
Page 215: ......
Page 263: ......
Page 269: ......
Page 274: ...OMRON CHAPTER 16 Connecting to Omron Industrial Components Release 2 0 Page 251...
Page 275: ......
Page 285: ......
Page 319: ......
Page 331: ......
Page 351: ......
Page 359: ...GLOSSARY OF TERMS CX Supervisor User Manual OMRON Page 336 Release 2 0...