3-23
3 Configuration Software
CJ-series PROFINET IO Controller Unit Operation Manual for NJ-series CPU Unit (W511)
3-3 PROFINET
IO C
ontroller DT
M
3
3-
3-3 C
onfig
uration
Test
The purpose of the
Test
button is to verify the communication setup, after CX-Server has been con-
figured. If the PC and the CPU are connected, selecting the
Test
button will invoke a request mes-
sage to the PROFINET IO Controller Unit via the CPU, to read its name and firmware version. If the
request succeeds, both items will be displayed in the PROFINET IO Controller Unit Information Box.
If the request fails (no response), an error message will be displayed in the Error Log view. In this
case the Firmware version field will revert back to its default contents, i.e. “--- “.
Information
The PROFINET IO Controller Information Box contains information obtained from the PROFINET IO
Controller Unit, after pressing the test button.
PLC Mode
The PLC Mode Box contains information and gives the user the opportunity to change the CPU
mode. The status and buttons are greyed out when the PROFINET IO Controller DTM is in the
offline mode. When in the online mode clicking the Read button will read the current CPU mode.
Selecting the required PLC mode and pressing the
Set
button will set the CPU to the required mode.
The IO Controller Setup item contains settings regarding the behavior of the PROFINET IO Control-
ler Unit. The IO Controller Setup item is shown below.
Network Settings
The Network Settings Box contains the fields to enter the PROFINET IO Controller’s Name, IP
Address and Subnet Mask. This information is required to let the PROFINET IO Controller connect
to the PROFINET IO network.
Item
Description
Description
Displays the name of the Unit, that is CJ1W-PNT21
Firmware Version
Displays the firmware version of the PROFINET IO Controller Unit.
IO Controller Setup