7.
Attach
Floor Runners
to completed floor frame.
There are 2 floor runners per 136 1/2” side and 5
completed runners in total. Use 6 - 2 1/2” screws
per Runner.
96”
5.
Complete all large and small frame
attachments. Screw each completed section
together with 8 - 2 1/2” screws.
6.
When completed, your floor footprint
should be 136 1/2” deep x 96” wide.
136 1/2”
8.
Make sure Runners are flush with outside
and front and rear floor framing but not
overhanging.
3.
Lay out
Floor Joist Frames
as
illustrated at left. There are 3 larger and 3
smaller Frame Sections. The Footprint for
the floor when attached together will be
136 1/2” deep x 96” wide.
4.
Attach each large and small floor joist frame
together with 6 - 2 1/2” screws per section.
Front
of
Shed