17.
Position rear solid wall
into place on plywood floor.
Butt both vertical wall studs
of side and rear walls
together and attach with
3- 2 1/2” screws. Screw at
the bottom, middle and top
of stud to secure properly.
Rear
W
all
Panels
Rear
Solid
Wall
Side
Solid
W
all
18.
With the corner wall
attachment complete, position
rear wall so bottom 2x3 wall
framing is sitting flush with
floor framing. Wall siding
should overhang floor by
approximately 1/2”. When
positioned correctly, add a
second rear wall panel and
attach both rear wall panel
studs together as per
Step 17
.
Rear
Solid
W
all
2x3 wall framing flush
with floor framing.
Be sure that
rear wall panels
fit between the
side wall panels
(sandwiched)
Side W
all Panel
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
Do Not Attach Walls To
Floor Until Step 26
Optional
- Caulking
seams will help prevent
moisture from entering
your shed.
Caulking
not included in kit.