Note:
The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level foundation
is critical. Choosing a foundation will vary
between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
10.
With Floor Runners attached, carefully flip
the floor over and place on your foundation.
Caution:
you will need 2 people to assist
you. Be careful when laying floor down not to
bend or twist floor. When in place, level floor
completely.
Concrete Slab
Foundation
Foundations
9.
Complete all Floor Runners.
11.
Position
Plywood Floor
pieces (6) on top of
completed floor joists. The Plywood is cut
slightly smaller than floor framing. Keep plywood
seams tight.
Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
Front
12.
With Plywood positioned correctly on floor
framing, attach with 1 1/4” screws. Use screws
every 16”.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 6
plywood
pushed together
at seam.
centered on
floor frame.