background image

INSTALLATION GUIDE

C4-PA18-8 Partskeeper Cabinet

Summary of Contents for C4-PA18-8

Page 1: ...INSTALLATION GUIDE C4 PA18 8 Partskeeper Cabinet...

Page 2: ...q 2 1 Attach Wall Brackets To The End Panels q 2 2 Mark Holes For Plus Nuts q 2 3 Attach Plus Nut q 2 4 Attach Partskeeper Cabinet To the Floor q 2 5 Attach Wall Brackets q Cordless Impact q Cordless...

Page 3: ...nt Item No Description Qty 40 715 Bracket Head 2 40 716 Bracket Arm 2 50 712 Floor Bracket 2 50 760 Partskeeper Rail 2 50 7009 End Panel Left 1 50 7010 End Panel Right 1 62 U5079 Plastic Partskeeper C...

Page 4: ...1 3 Fastener kits 90 204 Hex Bolt 5 16 3 4 98 116 Flat Washer 5 16 94 116 Serrated Nut 5 16 12 12 8 8 92 102 Screw 14 1 4 4 90 012 Screw 1 4 10 3 4 94 116 Serrated Nut 5 16 18 ZINC 12 12 Hex Bolt 5 1...

Page 5: ...7 Hex Bolt 5 16 18 1 1 4 GR 5 ZINC 90 212 4 4 8 8 98 116 Flat Washer 5 16 O D 7 8 ZINC 8 8 98 122 Lock Washer 5 16 ZINC 8 8 Hex Bolt 5 16 18 1 3 4 GR 5 ZINC 90 011 4 4 4 4 90 212 Hex Bolt 5 16 1 1 4 9...

Page 6: ...he partskeeper on a protected clean surface to avoid scratching TOOLS q Cordless Impact q 3 8 Driver Bit 92 102 Screw 14 1 HARDWARE USED 8 94 5022 NOTE Hand tighten the bolts for adjustment 1 2 1 Atta...

Page 7: ...2 bottom brackets to the end panels 1 2 4 Attach 1 partskeeper rail on the bottom of each end panel TOOLS q Cordless Impact q 1 2 Socket HARDWARE USED 4 94 5022 90 204 Hex Bolt 5 16 3 4 98 116 Flat W...

Page 8: ...e wall brackets to the panels aligning the brackets to the horizontal rim of the vehicle WALL BRACKET IMPORTANT For all Box Trucks make sure that the shelving is securely fastened to the structure of...

Page 9: ...ehicle horizontal rim 2 2 1 After attaching the brackets mark the holes on the brackets and bottom shelf to the vehicle PHASE 2 INSTALLATION 2 2 MARK HOLES FOR PLUS NUTS NOTE If you are using Ranger w...

Page 10: ...nk Wiring Harness and Hose NOTE Use 1 2 drill bit with drill collar to stop drill at 1 2 depth 2 3 1 Lift the assembled partskeeper cabinet on the side Drill all the marks using 1 2 drill bit w drill...

Page 11: ...HARDWARE USED Flat washer 5 16 Flat washer 5 16 BS 7 8 OD TOOLS q Cordless Impact q 1 2 Socket q 9 16 Wrench STEP 1 Assemble the 6491 plusnut tool with the hardware needed plus nut and the 9 16 wrench...

Page 12: ...the holes to the plusnuts then install the bottom shelf to the plus nuts PHASE 2 INSTALLATION 2 4 ATTACH PARTSKEEPER CABINET UNIT TO THE FLOOR without ranger floor TOOLS q Cordless Impact q 1 2 Socke...

Page 13: ...he floor using 1 hole saw then drill holes into the van floor for plus nut Attach plus nut in the van floor then lift the partskeeper cabinet back in place and attach the floor braket to the plus nut...

Page 14: ...ation is completed ensure all bolts are tightened NOTE Tighten the bolts that attach the bracket to the wall or wall rails 1st before tightening the bolts from the brackets to the end panels PHASE 2 I...

Page 15: ...o the end panels 2 5 2 Aligned the wall brackets to the wall mounting track kits then install the wall brackets to the wall mounting track kits using channel nuts IMPORTANT After installation is compl...

Page 16: ...Guide REV A1 Page 16 You have successfully installed your C4 PA18 8 Thank you for doing business with us For any feedback or suggestions you may have please contact cs rangerdesign com IMPORTANT After...

Reviews: