25.
When all walls are attached together, check alignment
with the floor. Bottom wall framing should sit flush with
outside of floor framing. Confirm 67” wide door opening at
bottom. When positioned correctly, fasten bottom wall plates
to floor using 4 - 2 1/2” screws per wall panel.
26.
Position
Front Top Plates
on
top of wall studs so they are flush on
the inside with Door Header. There
are 3 pieces of Front Top Plates
(2 end plates, angle cut on 1 end, and
1 middle plate, straight cut on both
ends). Together, the plates should be
centered evenly on the wall left to
right. Attach by screwing down into
Door Header with 4 - 2” screws.
Angle cut on ends.
Top Plates should be flush
with inside of wall framing.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 13
Confirm 67” Wide Door Opening at Bottom
Caulking
Optional
- Caulking
seams will help prevent
moisture from entering
your shed. Caulking not
included in kit.
Floor
Angle
screws into perimeter
Floor Joists.